QQ登录

只需要一步,快速开始

 注册地址  找回密码
查看: 14726|回复: 37
打印 上一主题 下一主题

2006国际数学建模竞赛试题!

[复制链接]
字体大小: 正常 放大
madio        

3万

主题

1312

听众

5万

积分

  • TA的每日心情
    奋斗
    2024-7-1 22:21
  • 签到天数: 2014 天

    [LV.Master]伴坛终老

    自我介绍
    数学中国站长

    社区QQ达人 邮箱绑定达人 优秀斑竹奖 发帖功臣 风雨历程奖 新人进步奖 最具活力勋章

    群组数学建模培训课堂1

    群组数学中国美赛辅助报名

    群组Matlab讨论组

    群组2013认证赛A题讨论群组

    群组2013认证赛C题讨论群组

    跳转到指定楼层
    1#
    发表于 2006-2-3 08:53 |只看该作者 |倒序浏览
    |招呼Ta 关注Ta |邮箱已经成功绑定

    MCM: The Mathematical Contest in Modeling
    ICM: The Interdisciplinary Contest in Modeling

    2006 Contest Problems

    MCM PROBLEMS



    PROBLEM A: Positioning and Moving Sprinkler Systems for Irrigation

    There are a wide variety of techniques available for irrigating a field. The technologies range from advanced drip systems to periodic flooding. One of the systems that is used on smaller ranches is the use of "hand move" irrigation systems. Lightweight aluminum pipes with sprinkler heads are put in place across fields, and they are moved by hand at periodic intervals to ensure that the whole field receives an adequate amount of water. This type of irrigation system is cheaper and easier to maintain than other systems. It is also flexible, allowing for use on a wide variety of fields and crops. The disadvantage is that it requires a great deal of time and effort to move and set up the equipment at regular intervals.

    Given that this type of irrigation system is to be used, how can it be configured to minimize the amount of time required to irrigate a field that is 80 meters by 30 meters? For this task you are asked to find an irrigation algorithm that minimizes the amount of time required by a rancher to maintain the irrigation system. One pipe set is used in the field. You should determine the number of sprinklers and the spacing between sprinklers, and you should find a schedule to move the pipes, including where to move them.

    A pipe set consists of a number of pipes that can be connected together in a straight line. Each pipe has a 10 cm inner diameter with rotating spray nozzles that have a 0.6 cm inner diameter. When put together the resulting pipe is 20 meters long. At the water source, the pressure is 420 Kilo-Pascal’s and has a flow rate of 150 liters per minute. No part of the field should receive more than 0.75 cm per hour of water, and each part of the field should receive at least 2 centimeters of water every 4 days. The water should be applied as uniformly as possible.


    PROBLEM B: Wheel Chair Access at Airports

    One of the frustrations with air travel is the need to fly through multiple airports, and each stop generally requires each traveler to change to a different airplane. This can be especially difficult for people who are not able to easily walk to a different flight's waiting area. One of the ways that an airline can make the transition easier is to provide a wheel chair and an escort to those people who ask for help. It is generally known well in advance which passengers require help, but it is not uncommon to receive notice when a passenger first registers at the airport. In rare instances an airline may not receive notice from a passenger until just prior to landing.

    Airlines are under constant pressure to keep their costs down. Wheel chairs wear out and are expensive and require maintenance. There is also a cost for making the escorts available. Moreover, wheel chairs and their escorts must be constantly moved around the airport so that they are available to people when their flights land. In some large airports the time required to move across the airport is considerable. The wheel chairs must be stored somewhere, but space is expensive and severely limited in an airport terminal. Also, wheel chairs left in high traffic areas represent a liability risk as people try to move around them. Finally, one of the biggest costs is the cost of holding a plane if someone must wait for an escort and becomes late for their flight. The latter cost is especially troubling because it can affect the airline's average flight delay which can lead to fewer ticket sales as potential customers may choose to avoid an airline.

    Epsilon Airlines has decided to ask a third party to help them obtain a detailed analysis of the issues and costs of keeping and maintaining wheel chairs and escorts available for passengers. The airline needs to find a way to schedule the movement of wheel chairs throughout each day in a cost effective way. They also need to find and define the costs for budget planning in both the short and long term.

    Epsilon Airlines has asked your consultant group to put together a bid to help them solve their problem. Your bid should include an overview and analysis of the situation to help them decide if you fully understand their problem. They require a detailed description of an algorithm that you would implement which can determine where the escorts and wheel chairs should be and how they should move throughout each day. The goal is to keep the total costs as low as possible. Your bid is one of many that the airline will consider. You must make a strong case as to why your solution is the best and show that it will be able to handle a wide range of airports under a variety of circumstances.

    Your bid should also include examples of how the algorithm would work for a large (at least 4 concourses), a medium (at least two concourses), and a small airport (one concourse) under high and low traffic loads. You should determine all potential costs and balance their respective weights. Finally, as populations begin to include a higher percentage of older people who have more time to travel but may require more aid, your report should include projections of potential costs and needs in the future with recommendations to meet future needs.






    ICM PROBLEM

    PROBLEM C: Trade-offs in the fight against HIV/AIDS

    Click the title below to download a zip file of the 2006 ICM Problem. Enclosed in this zip file you will find a PDF of the problem and all associated data (10) files. (File Size 3MB)

    2006国际数学建模竞赛试题!.zip (2.96 MB, 下载次数: 142)
    [此贴子已经被作者于2006-2-3 9:02:59编辑过]
    zan
    转播转播0 分享淘帖0 分享分享0 收藏收藏0 支持支持0 反对反对0 微信微信
    数学建模社会化
    zenith        

    4

    主题

    2

    听众

    22

    积分

    升级  17.89%

    该用户从未签到

    新人进步奖

    回复

    使用道具 举报

    receive        

    3

    主题

    2

    听众

    54

    积分

    升级  51.58%

    该用户从未签到

    新人进步奖

    回复

    使用道具 举报

    0

    主题

    0

    听众

    17

    积分

    升级  12.63%

    该用户从未签到

    新人进步奖

    回复

    使用道具 举报

    0

    主题

    0

    听众

    16

    积分

    升级  11.58%

    该用户从未签到

    新人进步奖

    回复

    使用道具 举报

    liuwei916        

    0

    主题

    0

    听众

    17

    积分

    升级  12.63%

    该用户从未签到

    新人进步奖

    回复

    使用道具 举报

    sliveofme        

    0

    主题

    0

    听众

    14

    积分

    升级  9.47%

    该用户从未签到

    新人进步奖

    回复

    使用道具 举报

    gjjemily        

    0

    主题

    0

    听众

    18

    积分

    升级  13.68%

    该用户从未签到

    新人进步奖

    回复

    使用道具 举报

    XNature        

    0

    主题

    0

    听众

    17

    积分

    升级  12.63%

    该用户从未签到

    新人进步奖

    如果真想从中得到提高的话

    请不要指望翻译

    数模竞赛如果依赖中文的话,是不会得到提高的

    回复

    使用道具 举报

    liuwei916        

    0

    主题

    0

    听众

    17

    积分

    升级  12.63%

    该用户从未签到

    新人进步奖

    回复

    使用道具 举报

    您需要登录后才可以回帖 登录 | 注册地址

    qq
    收缩
    • 电话咨询

    • 04714969085
    fastpost

    关于我们| 联系我们| 诚征英才| 对外合作| 产品服务| QQ

    手机版|Archiver| |繁體中文 手机客户端  

    蒙公网安备 15010502000194号

    Powered by Discuz! X2.5   © 2001-2013 数学建模网-数学中国 ( 蒙ICP备14002410号-3 蒙BBS备-0002号 )     论坛法律顾问:王兆丰

    GMT+8, 2026-4-18 07:28 , Processed in 0.403707 second(s), 109 queries .

    回顶部